Lillienlund horticulture
Boiler was installed in 2016 with an external 10m3 hopper with lid.
The boiler is used to heat the greenhouse.
The boiler is installed with chock-blaster for automatic cleaning of the boiler tubes.
Installation and plumbing work was done by Telesmeden