REKA A/S

Waste Buring Qaqortoq

The boiler was installed in 1998 with a waste pusher feeding system.

The boiler is used for district heating in Qaqortoq.

The boiler is installed with an electrostatic precipitator to minimize fluegas dust emmisions.